Longer, Wider, Deeper Spit Restoration Project

Longer, wider, deeper

β€’

Longer, wider, deeper β€’

Project Complete!

The Popponesset Spit and Popponesset Outer Approach Channel leading from the Bay to Nantucket Sound are vital organs to Mashpee’s ecosystem. Keeping the Outer Approach Channel dredged allows for proper flushing of the Bay with each tide. The Popponesset Spit protects the Bay and land of Mashpee to flourish.

SPB with the Town of Mashpee, obtained all necessary permits to expand and deepen the Outer Approach Channel, and placed that dredged sand on the Spit - strengthening the barrier beach.

In 2013, following Hurricane Sandy, SPB with the support of our partner Mass Audubon, initiated a campaign to restore the Popponesset Spit and significantly improve its resilience to future storms and sea level rise while helping to maintain water quality in Popponesset Bay. SPB collaborated with Woods Hole Group, a coastal engineering firm, to develop a strategy and design to achieve these objectives. SPB worked diligently to design and permit the Longer, Wider, Deeper Spit Restoration Project, coordinating efforts with State, Federal, Barnstable County, and Mashpee Town officials and Mass Audubon Society.

The Longer, Wider, Deeper Spit Restoration Project significantly enhances and safeguards the Popponesset Spit and Bay, by adding over 70,000 cubic yards of sand to widen the Spit beach and dunes. The Popponesset Approach Channel to Nantucket Sound was extended by 250 feet, widened by 50 feet, and deepened by 2 feet, incorporating a catch basin along a portion of the channel to prolong the channel's lifespan between future dredging projects. The channel dredging yielded over 57,000 cubic yards of sand that was placed on the Spit. Construction was completed in December 2025.